Getting back mid-July we got busy and are now caught up in AB, except for a couple surveys north of Edmonton, with 2 to do on the same trip just into northern BC. With most of AB surveys completed, it clears the way for a trip to SK in the next 2 weeks which will likely be followed by one to cover southern BC jobs in early September. Our scheduling is now primarily based on logistics and trying to group enough out of province surveys to try and avoid extra mileage charges to our clients or at least reduce them. Our typically busy fall season should be underway by mid-September.
About a 1/3 of our 2011 clients have already drilled wells on recommended sites this year. The completed wells all resulted at, or better than the yields estimated, 2 resulted in 50-60% higher yield than estimated, and none of the wells were drilled deeper than the maximum depth noted in the report. Considering the areas were all "tough to find water areas", and some of the wells were drilled on properties following failed drill attempts with dry holes, we can’t be more satisfied with the results and we are glad the clients feel the same.
Digging into a 2010 file yesterday while doing research on a nearby site, we came across a testimonial sent by our client earlier this year that we missed posting in spring so we are including it today.You can always call us for others and we are more than happy to provide.
